Bringing Your Design To Life!

In this issue of our monthly newsletter, we would like to share two recent case studies that show how a castellated or perforated finish can bring your design to life.  

Eltherington architectural has been manufacturing façade systems for over 60 years.
All our rainscreen systems have been independently tested and accredited to the specific requirements of CWCT and come in an unrivalled choice of materials, colours and finishes to help you bring your design to life.

Circle Square - Manchester


 

System:    Eltherington Castellated System (CS)
Material:    Aluminium
Finish:       Anodic Powder Coating
Size:          2500m2 of 4000mm high pressings

A CWCT tested system that offers unlimited castellated design options.
Circle Square is an area of Manchester City Centre on Oxford Road, in North West England. It is a 2.4 million sq ft development consisting of commercial buildings, student residential, private rented residential, retail and leisure space and a large public realm.
Circle Square is a joint venture between Vita Group and Bruntwood SciTech.
It is estimated to have cost £750 million.

 

                    

 

C4DI - Centre of Digital Innovation

 

 
 

System:    Eltherington Perforated Panel

Material:  Aluminium

Finish:       Anolok Anodising  

Size:          200m2

 Perforated with wave motif and logo.

The C4DI, or Centre of Digital Innovation, is Hull’s first dedicated workspace and venue for digital and technology companies. Inspiring, innovating and growing the best creative and technical minds, C4DI is a World class workspace for digital and technology companies and individuals. C4DI exists to provide the perfect environment for individuals and small business to work, collaborate, and grow.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                             
In partnership with Hilti we offer the complete system, from design, measure, brackets, fixings, mounting insulation, firestop, profiles & alignment to rainscreen cladding, as well as nationwide on-site support from the Hilti Building Envelope Specialists and Engineering team, we have every base covered.
The team at Eltherington are able to provide support to customers at all stages of the design and installation process. This is backed up by specialist teams from Hilti that can ensure outcomes are fully optimized on site. 
Eltherington operates a 12-acre state-of-the-art manufacturing facility in Hull and is able to supply a wide range of standard and bespoke solutions for building facades, roofline, column casings, perforated panels and 3D castellated cladding. 
All the company’s architectural metalwork solutions are manufactured at its new headquarters in Hull.

 

 

 

NBS+

 

Standards

 

 

 Back to main news